Capacity Economics
Capacity Economics
Know how close you are to your limits, and what to do next to get the most from them.
Let's ConnectWhen demand exceeds what you can deliver, every job you accept is a job you did not accept, and the real limit is rarely where it looks. Constraints move with the product mix, overlap across machines, crews, and setups, and shift again once you relieve one. Capacity Economics sorts out the gray areas. It finds the limits that actually bind, measures the slack around them, and puts a price on what an hour of the real constraint is worth. The result is clarity you can act on: what to quote, what to decline, and where added capacity would pay.
Questions we answer
- Which resources actually bind, and does that change with the product mix?
- Where does the constraint move once you relieve it, and how much slack sits everywhere else?
- How sensitive is the answer to demand and to setup delays?
- What is the shadow price of one additional hour at the bottleneck?
- Which jobs or products earn the highest contribution margin per constrained hour, and which earn the lowest?
- What is the opportunity cost of the work currently accepted?
- What is the minimum price worth quoting at the current load?
- Does adding a machine, a shift, or a hire pay back, and at which resource?
Our approach
We diagnose where your capacity really limits you, including where more than one constraint applies or the binding one changes with the mix, quantify what those limits cost, and turn the result into decision rules you can use the same week. Three terms do most of the work: contribution margin (what a job earns after its variable costs), shadow price (what one more hour of the bottleneck is worth), and opportunity cost (what you give up by accepting a job). Slack, meaning spare capacity at every other resource, tells us where the real limit sits. The work is short, focused, and built around your own numbers.
One machine, three kinds of work
To show the logic, take the simplest case: one bottleneck machine with 160 hours a month and three kinds of work competing for it. Real shops are messier, and that is where the work is.
| Work | Price | Variable cost | Bottleneck hours | Contribution margin per bottleneck hour |
|---|---|---|---|---|
| Job B | $900 | $600 | 0.75 | $400 |
| Job C | $1,000 | $670 | 1.0 | $330 |
| Job A | $1,200 | $700 | 2.0 | $250 |
Job A is the biggest job, but it earns the least per hour of the machine. Whether it deserves a slot depends on how busy the shop is, because the value of an hour of the machine (its shadow price) moves with demand:
| Measure | Slow month | Normal month | Busy month |
|---|---|---|---|
| Value of one bottleneck hour | $250 | $330 | $400 |
| Quoting floor for Job A (variable cost plus 2.0 hours at that value) | $1,200 | $1,360 | $1,500 |
| Net effect of quoting Job A at $1,200 | $0 | -$160 | -$300 |
At $1,200, Job A breaks even in a slow month and loses money in a normal or busy one, even though it shows a profit on paper. One fixed price is right in some months and wrong in others. That is the gray area.
Simplified illustration only. Real numbers come from your own jobs, and real shops have several interacting constraints and uneven demand.
What you get
- A clear picture of what really limits you, how it moves, and where slack sits.
- Your work ranked by what it earns from the constraint.
- A quoting floor shown as a range across slow, normal, and busy demand, with simple accept and decline rules.
- A read on how sensitive the answer is to demand and to setup delays.
- A view of whether added capacity would pay back, and where.
What we need from you
Basic information on what you sell, what it costs, and how long it takes at each stage, including setup. Past periods of demand, open quotes, and your win rate help us frame a low, expected, and high view. We work from your actual records where they exist and label every number as actual or estimated. Forward-looking inputs, such as the work likely to arrive, are estimates, and we say so. We handle the modeling.
Who it is for
Owners and general managers of businesses with limited capacity and more demand than they can fill. Investors and lenders who need to understand how much of a target's margin depends on its constraint.
Engagement
Scope and terms are agreed on a short scoping call before any work begins. Fee structures, including options tied to results, are discussed there.
Not only machines
The method works on any scarce unit. What changes is the vocabulary and how the constraint behaves. In a clinic or restaurant an empty hour cannot be sold later, so slack expires. Capacity often arrives in steps, a second chair or a second truck, not one hour at a time. No-shows reduce what a booked hour delivers. We build those into the analysis.
| Business | The limiting resource | A job is a |
|---|---|---|
| Shop or plant | Machine or crew hours | Job or batch |
| Clinic or practice | Provider or chair hours | Appointment or procedure |
| Trucking or logistics | Truck days, driver hours, dock doors | Load or lane |
| Professional services | Billable hours by skill | Engagement |
| Restaurant or venue | Seats and kitchen hours | Cover or event |
| Trades and construction | Crew days | Project phase |